Menu & search
Foods / Confectionery & chocolate
Food application

Moulded chocolate processing

Plan moulded bars and solid chocolate shapes around the starting chocolate and mould specification.

Start with the finished specification

Plan moulded bars and solid chocolate shapes around the starting chocolate and mould specification.

State the incoming material, recipe variants and exact point where the proposed supply begins. Specify accepted product and rejects separately, and ask bidders to document each equipment handover.

Map the equipment duties

Use this map to define supply boundaries and trial questions. It is a planning outline; operating conditions and preservation need product-specific validation.

  1. Define feed

    Purchased chocolate versus bean-to-bar scope

    Explore this stage
  2. Temper where required

    Establish formulation-specific chocolate duty

    Explore this stage
  3. Fill & handle moulds

    Specify dosing, vibration and mould handling

    Explore this stage
  4. Cool & demould

    Agree release and finish criteria

    Explore this stage
  5. Inspect & pack

    Define downstream handling and packing

    Explore this stage

Questions to settle before a quotation

  • Does the project start with purchased chocolate or include making chocolate from cocoa?
  • Is the product solid, filled or hollow, and what separate equipment does that require?
  • How will mould finish, release, piece weight and rejects be demonstrated?

Ask bidders to state trial material, accepted output, losses, utilities, changeover time and scope exclusions in writing. Compare the offered configuration using the same recipe and acceptance criteria.

Equipment trial & quotation guide

Equipment examples

Selmi Top EX

Continuous chocolate tempering model; tank mass and advertised hourly production are separate measures.

Common questions

Does this map provide operating settings?

No. It organises equipment discovery and project questions. Product specialists must establish process settings, validated requirements and release criteria.

Are these examples a matched complete line?

No. They document individual duties and different production scales. Confirm model pairing, recipe and interfaces in a project-specific proposal.

Sources & record scope

Official manufacturer pages checked on 4 October 2026. Product facts are attributed; route maps and buyer questions are editorial planning aids. Confirm the offered configuration with the manufacturer.