Published equipment facts
- Manufacturer
- Yung Soon Lih / EVERSOON
- Record type
- Single/double grinding and separating equipment family
- Primary duty
- Grind feed and separate soy liquid from residue
- Configuration
- Single or double grinding; confirm the exact offer
- Capacity basis
- No universal finished-tofu output assigned here
The manufacturer distinguishes raw and cooked slurry systems in its grinding portfolio. The grinding, separation and cooking sequence must be agreed for the selected route; these examples are not a named F-16 specification.
Questions to settle before a quotation
- Does the proposed route separate residue before or after cooking?
- What soybean condition, liquid concentration and residue criteria define the trial?
- How are feed preparation, cooking and residue handling supplied and measured?
Ask bidders to state trial material, accepted output, losses, utilities, changeover time and scope exclusions in writing. Compare the offered configuration using the same recipe and acceptance criteria.
Equipment trial & quotation guideSupply boundaries
Do not convert a dry-bean feed figure into tofu output. Grinding and separation alone do not establish cooking, preservation or a complete soy-food line.
Related category & manufacturer
Soybean grinders & separatorsCommon questions
Does this record establish pricing or stock?
No current offer is included. Request a dated configuration, delivery and support proposal from the manufacturer.
What should a representative trial cover?
Use actual ingredients, minimum and maximum production conditions, manual handling, cleaning and agreed accepted-product measurements. Keep supplier facts separate from project guarantees.
Related food and process routes
Connect the selected equipment duty with Firm tofu processing and soy-food process planning. Define upstream preparation, product handling and downstream equipment separately; these planning links do not establish a complete commissioned line.
Sources & record scope
Official manufacturer pages checked on 4 October 2026. Product facts are attributed; route maps and buyer questions are editorial planning aids. Confirm the offered configuration with the manufacturer.
The official contact route was rechecked on 7 October 2026. Equipment facts retain their existing source date. Confirm the supplying entity, options, units and accepted line output in a current offer.
Application context and process planning
The following food and process routes are already associated with this record. Use them to define the material, upstream and downstream duties, and trial requirements; a directory association is not a guarantee that every configuration can handle every application.